févr.

24

24.2. - 25.2.

American Data Center Private Power Forum 2027

American Data Center Private Power Forum 2027 Houston, Texas, USA Billets

Credits: ECV International

Début:
Fin:
Houston, Texas, USA

The American Data Center Private Power Forum 2027, taking place on February 24–25, 2027 in Houston, Texas, will bring together data center owners and operators, utilities, independent power producers, technology providers, EPC companies, investors and policymakers to discuss the technologies, business models and strategies shaping the future of AI data center power in America.

 

For data center developers, power availability can increasingly determine where and how quickly new capacity can be deployed.

 

The forum will examine how data centers can reduce dependence on constrained grid infrastructure and develop more resilient energy architectures through:

On-site natural gas generation, Fuel cell power generation, Hybrid microgrids, Battery Energy Storage Systems (BESS), Behind-the-meter private grids, Renewable energy and long-duration energy storage, Advanced nuclear technologies, Demand response and energy procurement, DC microgrids and advanced power distribution, Integrated generation, storage and control systems

 

The agenda specifically addresses the transition from traditional backup generation toward permanent on-site power infrastructure, including multi-generator architectures capable of supporting large-scale data center capacity.

 

The forum

...

afficher plus

The American Data Center Private Power Forum 2027, taking place on February 24–25, 2027 in Houston, Texas, will bring together data center owners and operators, utilities, independent power producers, technology providers, EPC companies, investors and policymakers to discuss the technologies, business models and strategies shaping the future of AI data center power in America.

 

For data center developers, power availability can increasingly determine where and how quickly new capacity can be deployed.

 

The forum will examine how data centers can reduce dependence on constrained grid infrastructure and develop more resilient energy architectures through:

On-site natural gas generation, Fuel cell power generation, Hybrid microgrids, Battery Energy Storage Systems (BESS), Behind-the-meter private grids, Renewable energy and long-duration energy storage, Advanced nuclear technologies, Demand response and energy procurement, DC microgrids and advanced power distribution, Integrated generation, storage and control systems

 

The agenda specifically addresses the transition from traditional backup generation toward permanent on-site power infrastructure, including multi-generator architectures capable of supporting large-scale data center capacity.

 

The forum will go beyond high-level discussions and explore the technologies, business models and deployment strategies behind resilient data center power.

 

Key sessions include:

  • The Future of Power & Energy in American Data Centers
  • Bring-Your-Own-Generation & the BYONC Era
  • On-Site Generation: Natural Gas, Fuel Cells & Hybrid Microgrids
  • BESS for Data Center Resilience
  • Power Infrastructure for AI Factories
  • Microgrids + BESS for AI Data Centers
  • Advanced Nuclear & 24/7 Energy
  • Long-Duration Energy Storage & Renewable Energy
  • Behind-the-Meter Private Grids & AI Campuses

 

Key Highlights:

  1. Decode new FERC/NERC reliability mandates and the IRAS/BYONC framework
  2. Explore onsite generation: natural gas, fuel cells, gas turbines, advanced nuclear
  3. Evaluate BESS, DC microgrids, solid-state transformers, and 800VDC architecture
  4. Learn from real-world case studies on microgrid integration and behind-the-meter private grids
  5. Network with data center owners, utilities, EPCs, investors, and policymakers

 

Who Should Attend:

Hyperscale Data Center Operators, Colocation Data Center Providers, AI Infrastructure & Emerging Data Center Players, Utilities & Grid Operators, Independent Power Producers, Onsite Generation Providers, Microgrid & Control System Integrators, BESS & Energy Storage Companies, Power & Energy Technology Providers, Cooling & Thermal Management Suppliers, EPCs & Engineering Companies, Energy Investors, Industry Associations,etc.

 

Why Attend:

Master project economics, financing, and scaling from pilot to commercial deployment

Gain actionable strategies for resilience, decarbonization, and cost control

Connect face-to-face with the decision-makers shaping U.S. data center power

 

For registration and sponsorship opportunities, contact:

marketing@ecvinternational.com

Follow us on LinkedIn:

https://www.linkedin.com/showcase/american-data-center-private-power-forum-2027

 

Across two days in Houston, the forum will bring together technical, commercial, regulatory and investment perspectives around one critical question: How can America’s data centers secure the reliable power required for the AI era while managing cost, grid constraints, resilience and sustainability?

 

Join industry leaders in Houston on February 24–25, 2027, and explore the strategies and technologies shaping the next generation of resilient data center power infrastructure in America.

afficher moins

Organisateur

Organisateur de American Data Center Private Power Forum 2027

ECV International

Billets

La vente se termine le jeudi, 25.02.2027 17:00

Offline (On-site) Fee

2'057.70 €
Le prix affiché est le montant total à payer (taxes et frais de service inclus). Prix du billet fixé par l'organisateur: € 2,000.
Non annulable
Flex-Badge
Avec le Flex-Ticket, tu bénéficies d'une liberté maximale : annule jusqu'à 48 heures avant le début de l'événement sans avoir à fournir de motif. Tu seras remboursé du prix total du billet, moins des frais de traitement minimes (€ 91.9).
2'337.99 €
Le prix affiché est le montant total à payer (taxes et frais de service inclus). Prix du billet fixé par l'organisateur: € 2,000.
Avec le Flex-Ticket, tu bénéficies d'une liberté maximale : annule jusqu'à 48 heures avant le début de l'événement sans avoir à fournir de motif. Tu seras remboursé du prix total du billet, moins des frais de traitement minimes (€ 91.9).

Annulable jusqu’à 48 heures avant le début de l’événement

incluent les frais de service

Total: XX.XX
Bezahle nach 30 Tagen. Mehr erfahren
PayPal – später bezahlen

Kaufe jetzt, was Du möchtest. Bezahle erst in 30 Tagen.

Erhältlich für Einkäufe i.H.v. 1 € - 3.000 €.

  1. Wähle PayPal als Bezahlmethode und nutze die Option, 30 Tage später zu bezahlen.
  2. Schließe deinen Einkauf in wenigen Schritten ab.
  3. Du benötigst mehr als 30 Tage? Optional kann eine Verlängerung der Zahlungsfrist um weitere 30 Tage oder alternativ um 54 Tage gegen Gebühr beantragt werden.
Veuillez d'abord sélectionner les billets d'une catégorie donnée
Veuillez d'abord sélectionner les billets d'une catégorie donnée
Veuillez d'abord sélectionner les billets d'une catégorie donnée
Aucun de ces modes de paiement ?

Les billets sont également disponibles dans nos Points de vente.

Points de vente de billets

Vous trouverez des billets pour cet événement dans les points de vente suivants :

Total: XX.XX

Veuillez d'abord sélectionner les billets d'une catégorie donnée
Veuillez d'abord sélectionner les billets d'une catégorie donnée
Veuillez d'abord sélectionner les billets d'une catégorie donnée

Infos

Lieu:

Houston, Texas, USA

Organisateur

American Data Center Private Power Forum 2027 est organisé par:

ECV International